SINOPEC Quanzhou Ethylene Sulfur Recovery Exhaust Incinerator

Time:August 5,2020
Share To:

Size:L 19m*W 17m*H 21m

Working Temp.:1200 C

Construction Time:2009.11-  2010.3

Materials Supplied:Insulation bricks、Castables、Ceramic fiber blanket etc.

Scope of Contract:Kiln lining design、Material supply、on-site construction.

EPC: Nanjing chemical design institute